Electrical power UNITS FOR DOUBLE-SCISSORS LIFT

Standard Description
Outfitted using the zero leak bidirectional checking sole-noid valves, this energy unit is made for the operation of two independent circuits. Which are respectively to the primary and subordinate platforms on the double scissors lift. Two cut-off valves are used for lowering the machine manually in situation of electrical power reduction. If much more independent circuits are required for your application please contact us for availability.
Remark: 1. Please talk to our income engineer for that distinct pump displacement, motor power or tank capability.
2. CSA or UL certified motors are available upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which might only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all the hydraulic elements concerned prior to installation of the power unit.
three. Viscosity from the oil shoud be 15~46 cst,and also the oil should really be clean and absolutely free of impurities,N46 hydraulic oil is suggested.
four. The electrical power unit should be mounted vertically.
five. Check the oil level during the tank just after the preliminary running of the power unit.
6. Oil altering is needed following the first a hundred operation hrs,afterwards the moment just about every 3000 hours.

Tags

flexible rubber coupling

As one of leading flexible rubber coupling manufacturers, suppliers and exporters of products, We offer flexible rubber coupling and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of flexible rubber coupling

Recent Posts